New Fellowship Hall >
New Church Sign All Finished!
New Church Sign All Finished!
With the foundation poured and fully cured, the new sign was assembled. The assembly weighed 740 lbs, making it too heavy to manhandle. A nearby heavy equipment operator came over to help hoist the unit into position. 8/26/05
|